BOKAWATER · Specialist series03 / Seawater desalination
BOKAWATERSeawater desalination
Seawater desalination

Islands & remote communities

Island supply planning combines equipment selection with storage, logistics and available operating skills. Map daily demand and periods when power or seawater intake may be unavailable. Include chemical and spare-parts deliveries in the operating plan. The proposal should state what happens during maintenance rather than assuming uninterrupted output.

BOKAWATER / 03

Product series

Compare the range ↗
SWRO-2 portable desalination machine
Portable systems

SWRO-2 portable desalination machine

SWRO-2

A portable seawater desalination product for projects where transport and setup are key selection factors. Review the local intake, daily water demand and available electrical supply before defining the operating arrangement.

View product ↗
SWRO-3 small desalination plant
Small plants

SWRO-3 small desalination plant

SWRO-3

A small seawater desalination plant for localized water supply enquiries. Evaluate the plant together with its intake, treated-water tank and operating schedule so that daily demand and reserve storage are considered together.

View product ↗
SW-02 OEM seawater desalination system
Engineered & OEM systems

SW-02 OEM seawater desalination system

SW -02

A seawater desalination product for OEM and engineering enquiries. Define the package around the intake, required product water and site interfaces, then request a configuration-specific equipment schedule and performance basis.

View product ↗

Questions worth settling early

  • Daily demand and reserve storage
  • Power availability and intake access
  • Consumables and spare-parts logistics

What to prepare

  • Seawater salinity, analysis and temperature range
  • Intake arrangement and seasonal water changes
  • Daily water demand, product quality and storage
  • Power, concentrate route, corrosion exposure and service access

Make the scope explicit

Ask the proposal to distinguish equipment supply, civil works, external piping, electrical connections, commissioning, training and consumables. Confirm each responsibility in the project quotation. Items discussed on this website are planning considerations, not an automatic inclusion in every supply package.

A nominal output is meaningful only with stated salinity, temperature and product-water conditions.
Discuss your project ↗

Bring us the conditions. Let’s define the system.

A useful enquiry can start before every parameter is known. Tell us what you know and where engineering input is needed.

Discuss your project
Product reference assistant