Island desalination: size storage before choosing the RO duty

Turn island water demand, delivery peaks, shutdown reserve and available production hours into a clear storage and seawater RO operating-duty brief.

A remote island rarely consumes water at the same rate all day, while a seawater RO package performs best against a defined operating schedule. Product-water storage connects those two patterns. Before comparing equipment capacities, document demand, storage that is genuinely usable, power availability and the periods reserved for cleaning or maintenance.

1. Build an hourly demand profile

Separate drinking, accommodation, kitchen, laundry, process, irrigation and fire-service demands. Record normal and peak occupancy, delivery days for visiting vessels, seasonal tourism and any emergency users. Use measured meter totals where available and retain at least one high-demand week. Daily averages alone hide morning, meal-time and vessel-filling peaks that the distribution tank may need to cover.

State which demands require desalinated water and which can use another source. Identify the required quality and verification point for each potable or process stream. Add distribution losses only as a declared planning allowance, not as an unexplained percentage. The final schedule should show hourly demand, daily total, credible peak, seasonal range and any demand that can be postponed during a power or intake interruption.

2. Separate tank volume from usable reserve

List existing and proposed tanks with nominal volume, minimum operating level, overflow level and volume unavailable because of suction, freeboard or water-quality management. Usable storage is the volume between the agreed upper and lower operating levels. Keep fire reserve, emergency reserve and routine balancing volume visible as separate lines so one purpose is not silently counted twice.

Test the balance hour by hour: opening usable storage plus RO production minus consumption equals closing usable storage. As a simple illustration, demand of 120 m³/day and 20 available production hours corresponds to 6 m³/h of average permeate before losses or reserve. If only 16 hours remain after a maintenance or power window, the arithmetic becomes 7.5 m³/h. These figures explain the method; they are not BOKAWATER model ratings or recommended margins.

3. Define the operating window and interruption cases

Describe grid, generator or renewable-power windows, expected voltage and frequency, intake restrictions, tide or turbidity events, operator coverage and permitted noise hours. Reserve time for flushing, chemical cleaning, cartridge changes and planned inspection. Specify whether the plant can start and stop daily, whether tanks provide stable suction to distribution pumps, and how product water is protected during storage.

Run at least normal-day, peak-day, planned-maintenance and credible outage cases. For each case, show available production hours, required permeate, lowest tank level and any demand-management action. Then ask the supplier to present feed, permeate and concentrate flows, pretreatment assumptions, energy boundary, controls and restart procedure. Seawater salinity, temperature and intake quality still govern the engineering projection; storage arithmetic cannot determine recovery or membrane selection by itself.

Data to collect before comparing proposals

Parameter / interfaceUnit / formatWhy it matters
Demand recordHourly profile and m³/daySeparate normal, peak and seasonal cases.
Water usesPotable, process, service and fireAssign quality and priority to every use.
Usable storageUpper level minus lower operating levelExclude freeboard, dead volume and dedicated reserves.
Production windowAvailable hours per dayDeduct cleaning, maintenance and power restrictions.
Illustrative dutyDemand divided by available hoursAdd only explicit allowances and verify units.
Power availabilityGrid, generator, renewable scheduleState voltage, frequency and outage scenario.
Intake conditionSalinity, temperature, tide and turbidityProvide seasonal data and sampling point.
Interruption casesMaintenance, intake upset and outageTrack the minimum tank level in each case.
Supplier outputWater balance, energy boundary and controlsRequire assumptions rather than a capacity label.

Technical references

Continue your project

Download project data sheet (CSV) ↓Equipment ↗Selection guide ↗

Bring us the conditions. Let’s define the system.

A useful enquiry can start before every parameter is known. Tell us what you know and where engineering input is needed.

Discuss your project
Product reference assistant